WP 5 – Development of efficient computation modules and implementation
In order to use these tools and methods in a streamlined design workflow, they have to be implemented in modules and the input generated in WP2, WP3 and WP4, need to be standardized. This enables the exchange of information and data between these modules, which is necessary since several procedures shall be executed in parallel to enable a foundation geometry optimization.
Nallathamby Sivasithamparam
Senior Engineer Computational geomechanics nallathamby.siva@ngi.no+47 406 94 933
Jung Chan Choi
Senior Engineer Energy Geomechanics and Geophysics jungchan.choi@ngi.no+47 902 91 661